https://www.wanderer.com/news/mattapoisett-fire-station-front-and-center/
Calling it "an elaborate process," Hickey said, "We went through it
three times," referring to assessing space requirements. Each time the
OPM and architect were sent back to the drawing board to squeeze out
costs while preserving the "must have" items that had been identified.
Even with that, the disparity of the estimates between the two firms
was troubling.
??????????
No comments:
Post a Comment